OptiFab Technologies home

Workbench / Tool 03 · OP 30 Schedule

Shop Schedule Planner

"Can we take it by Friday?" Enter the job and your capacity, then get a clear answer.

OP 10 · Job

For your own reference, for example "Brackets for customer A".

Number of parts.

pcs

The day the parts must be finished.

Machine minutes per part.

min

Press-brake minutes per part. 0 if none.

min

Deburr or clean minutes per part. 0 if none.

min

OP 20 · Existing load

Hours already booked on each step before the due date.

h

h

h

OP 30 · Capacity

Demo values. Set them to match your shop.

Machines for each step

Productive hours in one shift.

h

Shifts you run each working day.

Working days

Enter the job and press Plan it.

Demo estimate, not a binding quote.

Capacity check

Result · Demo

Inputs changed. Fix any highlighted field, then press Plan it.

Hours needed and available for each step
StepNeededAvailableSpare or short

Day by day, per machine

  • Already booked
  • This job
  • Daily capacity
  • Hours that don't fit

Assumptions used

  • Enter a job to see the assumptions behind the result.

Back up the answer

Join early access

OptiFab is free while we're in early access. Leave your email and we'll tell you when new tools and features are ready.

We only use your email for early-access updates. You can ask us to remove it at any time: support@opti-fab.co.

How to check capacity for a rush job

A rush order comes in by phone. Before you say yes, you need to know whether the cutter, the press brake and finishing have the hours before the due date, given what's already booked. This planner does that sum and shows it.

Hours needed

For each step (cut, bend, finish), the planner multiplies quantity by the minutes per part and turns it into hours.

Hours available

For each step, it multiplies machines by hours per shift and shifts per day, over the working days left before the due date. Then it takes away the hours already booked.

The verdict

If every step has room, the job fits. If any step has less than 10% of its capacity to spare, it's tight. If any step runs out, the planner says by how many hours, so you know whether an extra shift would fix it or whether you need a later date.

The chart

A bar for each machine on each day shows the existing load and the new job together, so the bottleneck is easy to spot. The same numbers are available as a table.

Its limits

This is a capacity check, not a full scheduling system. It doesn't model setups, changeovers, breakdowns or waiting for material, and it treats each step's machines as interchangeable. Use it to give a quick, honest answer, then confirm with your own production plan.

You can print the result or copy it as text to paste into an email or a job ticket. Need the minutes per part? The Quote Estimator shows cutter and press-brake hours for a batch, and the Nesting Yield Preview shows how many sheets the run takes.

Laser cutter, press brake and finishing booth in a row with traveler cards and a highlighted rush-job pallet heading to the dock.