Workbench / Tool 03 · OP 30 Schedule
Shop Schedule Planner
"Can we take it by Friday?" Enter the job and your capacity, then get a clear answer.
https://opti-fab.co/schedule-planner.html
Enter the job and press Plan it.
Demo estimate, not a binding quote.
Capacity check
Result · Demo
Inputs changed. Fix any highlighted field, then press Plan it.
| Step | Needed | Available | Spare or short |
|---|
Day by day, per machine
- Already booked
- This job
- Daily capacity
- Hours that don't fit
Assumptions used
- Enter a job to see the assumptions behind the result.
✓ You're on the list. We'll email you when there's something new to try.
How to check capacity for a rush job
A rush order comes in by phone. Before you say yes, you need to know whether the cutter, the press brake and finishing have the hours before the due date, given what's already booked. This planner does that sum and shows it.
Hours needed
For each step (cut, bend, finish), the planner multiplies quantity by the minutes per part and turns it into hours.
Hours available
For each step, it multiplies machines by hours per shift and shifts per day, over the working days left before the due date. Then it takes away the hours already booked.
The verdict
If every step has room, the job fits. If any step has less than 10% of its capacity to spare, it's tight. If any step runs out, the planner says by how many hours, so you know whether an extra shift would fix it or whether you need a later date.
The chart
A bar for each machine on each day shows the existing load and the new job together, so the bottleneck is easy to spot. The same numbers are available as a table.
Its limits
This is a capacity check, not a full scheduling system. It doesn't model setups, changeovers, breakdowns or waiting for material, and it treats each step's machines as interchangeable. Use it to give a quick, honest answer, then confirm with your own production plan.
You can print the result or copy it as text to paste into an email or a job ticket. Need the minutes per part? The Quote Estimator shows cutter and press-brake hours for a batch, and the Nesting Yield Preview shows how many sheets the run takes.